Standard SLC-15M 7-Stage Pittsburgh Lock former with 1.5mm Material Capacity:
A Stage Pittsburgh lock former is a machine tool used in sheet metal fabrication to form a Pittsburgh lock joint, which is a type of mechanical connection commonly used in ductwork. With a 1.5mm material capacity, it is capable of working with sheets of metal that are 1.5mm thick. The exact design of a Stage Pittsburgh lock former may vary, but it typically consists of a set of rollers or dies that are used to shape the metal sheets into the desired joint configuration. The machine is operated by feeding the metal sheets through the rollers, which bend and form the material into the required shape.
Main Features:
Lock Former Machine with 9 Stations is used for giving shapes to galvanization sheets. The thickness of the processed sheet is 0.5-1.2 mm. All gears, shafts, and rolls of the machine are made of high-quality bearing steel. It is easy to install, reasonable in mechanical principle, flexible in movement and convenient in operation.
Delivery is 8-12 Weeks from Deposit
Here is a general outline of how to use a Stage Pittsburgh lock former with a 1.5mm material capacity:
Prepare the metal sheets: Cut the metal sheets to the desired length and width, ensuring that they are clean and free from any debris or burrs.
Load the metal sheets: Load the metal sheets into the machine, making sure that they are positioned correctly for forming.
Adjust the settings: Adjust the settings on the machine to match the specifications of the joint being formed, including the material thickness and the desired joint angle.
Start the machine: Start the machine and begin feeding the metal sheets through the rollers.
Monitor the forming process: Observe the forming process to ensure that the metal is being formed correctly and that the joint is being formed to the desired specifications.
Complete the forming process: Continue feeding the metal sheets through the machine until the desired joint has been formed.
Inspect the joint: Inspect the joint to ensure that it has been formed correctly and that the metal sheets are securely joined.
It is important to follow the manufacturer's instructions and safety guidelines when using a Stage Pittsburgh lock former. It is also recommended to receive proper training before operating the machine.
Standard SLC-15M 7-Stage Pittsburgh Lock former with 1.5mm Material Capacity:
A Stage Pittsburgh lock former is a machine tool used in sheet metal fabrication to form a Pittsburgh lock joint, which is a type of mechanical connection commonly used in ductwork. With a 1.5mm material capacity, it is capable of working with sheets of metal that are 1.5mm thick. The exact design of a Stage Pittsburgh lock former may vary, but it typically consists of a set of rollers or dies that are used to shape the metal sheets into the desired joint configuration. The machine is operated by feeding the metal sheets through the rollers, which bend and form the material into the required shape.
Main Features:
Lock Former Machine with 9 Stations is used for giving shapes to galvanization sheets. The thickness of the processed sheet is 0.5-1.2 mm. All gears, shafts, and rolls of the machine are made of high-quality bearing steel. It is easy to install, reasonable in mechanical principle, flexible in movement and convenient in operation.
Delivery is 8-12 Weeks from Deposit
Here is a general outline of how to use a Stage Pittsburgh lock former with a 1.5mm material capacity:
Prepare the metal sheets: Cut the metal sheets to the desired length and width, ensuring that they are clean and free from any debris or burrs.
Load the metal sheets: Load the metal sheets into the machine, making sure that they are positioned correctly for forming.
Adjust the settings: Adjust the settings on the machine to match the specifications of the joint being formed, including the material thickness and the desired joint angle.
Start the machine: Start the machine and begin feeding the metal sheets through the rollers.
Monitor the forming process: Observe the forming process to ensure that the metal is being formed correctly and that the joint is being formed to the desired specifications.
Complete the forming process: Continue feeding the metal sheets through the machine until the desired joint has been formed.
Inspect the joint: Inspect the joint to ensure that it has been formed correctly and that the metal sheets are securely joined.
It is important to follow the manufacturer's instructions and safety guidelines when using a Stage Pittsburgh lock former. It is also recommended to receive proper training before operating the machine.